Elewit has completed the development of the GridCal and Newton improvement project for electrical planning, known as the Siroco project, in collaboration with the electrical planning and system operation model teams of Red Eléctrica. This project represents a significant step forward in the simulation capabilities of electrical grids, as new advanced functionalities have been developed to meet current needs and foresee future requirements in the electrical sector.
Elewit and Red Eléctrica optimise electrical planning analysis with the Siroco GridCal improvement project
Generative AI applied to Red Eléctrica's grid access processes
Elewit and HESStec revolutionize Energy Storage with the Launch of Their Synchronous Grid-Forming Hybrid Storage Project
Continuous system monitoring of by-products resulting from SF6 degradation in high voltage equipment of the power transmission grid using THz
One of the electrical hazards that must be taken into consideration to ensure safe working conditions for Redeia's technical equipment is arcing. These are usually generated by a short circuit and can happen anywhere electrical equipment is connected. An electric arc is, in short, a continuous electric discharge of high current flowing through an air gap between conductors. To prevent such discharges, electrical insulators are used: materials capable of preventing or slowing the flow of electric current.
Transforming substation power supply for a sustainable future
Software to anticipate potential damage in submarine interconnections
Elewit, through its CVC, is committed to develop a hybrid storage system with HESStec in a storage and renewable hybridization project
Our intrapreneurs’ latest advancements
Elewit and PredictLand, winners of the first IndesIA V Datathon semifinal
Installation of 5G antenna on transmission grid pylons